Skip Navigation LinksCSL home > Library > Document

A CRITICAL EXAMINATION OF THE INVESTMENT PROPOSALS FOR ...

w

A critical examination of the investment proposals for Unit 6 of the Šoštanj Power Plant

29 pages, pdf
 Download Back

 A critical examination of the investment proposals for Unit 6 of the Šoštanj Power Plant

Publisher: CEE Bankwatch Network

Volume: 29 pages, pdf

Description:

The Holding Slovenske Elektrarne (HSE), owner of the electricity production unit Termoelektrarna Šoštanj (ŠTPP) in Slovenia, has commissioned a plan to construct Unit 6 of this powerplant. The main reason for the investment in a new Unit 6 is that the existing production units in ŠTPP are obsolete and operating with outdated technology which will eventually fail to comply with the minimum requirements for such units. The proposed Unit 6 will replace Units 4 and 5 and will be fired using lignite from the nearby Velenje mine. Using modern technology, efficiency of electricity production will be enhanced and environmental impacts per produced unit of electricity lowered compared to present electricity production.